How are data centre façades designed for airflow and security?

Data centre façade design starts by sizing the ventilation louvres to pass the airflow the cooling strategy needs at an acceptable pressure drop, then adding protection to the level set by the project’s security risk assessment. That protection may be mesh, bars, a separate grille or a forced-entry rated louvre assembly. Because security components restrict airflow, the two requirements must be developed together and assessed as one complete assembly, not as separate product choices.

Ventilation openings can occupy a significant proportion of a data centre façade. Their design must support the building-services strategy while maintaining weather protection, physical security and the intended architectural appearance. These requirements are related, but they should not be treated as a single product-selection exercise.

The correct solution depends on how the building is cooled and ventilated, where the protected security line sits and what performance has been specified for the complete façade assembly. Early coordination between the M&E engineer, security consultant, façade designer and specialist louvre contractor is therefore essential.

What information is needed before a louvre can be selected?

Data centres generate substantial heat loads from the equipment they house. Cooling strategies such as direct free-air cooling, indirect evaporative cooling or air-cooled mechanical plant can all require large volumes of outside air to move through the building envelope.

Where the cooling or ventilation strategy requires outside air, the M&E engineer should define the design airflow, maximum permissible pressure drop and relevant operating conditions at each intake and exhaust opening. The required resistance to wind-driven rain, any acoustic criteria and the effect of screens, mesh, blanking panels or secondary security components must also be established.

Pressure drop matters beyond the louvre selection itself. Excess resistance at the façade adds to fan energy for the life of the building, which affects running costs and operational carbon.

Free area is useful when comparing geometries, but it does not describe the complete aerodynamic or weather performance of a louvre. Blade profile, pitch, depth and any components installed behind the louvre all affect resistance. Selection should therefore be based on tested performance data for the proposed configuration rather than free-area percentage alone.

The façade design must also address intake and exhaust separation, drainage, maintenance access, removable sections, access doors, structural support, coating durability and the interfaces with adjacent cladding. These details can be as important as the louvre blade itself.

How should the security requirement be defined?

A ventilation opening can create a route through an otherwise secure envelope. The project team must first identify the protected line and the credible threat. The requirement may be limited to preventing unauthorised access or the insertion of objects, or it may call for a defined level of resistance to forced entry.

A conventional architectural weather louvre can be combined with security mesh, bars or a separate grille where that arrangement satisfies the project risk assessment. Where a classified level of forced-entry resistance is required, the complete louvre or door assembly must be assessed in the configuration in which it will be installed. The material from which a louvre is manufactured does not, by itself, provide a security rating.

The security brief will normally be developed by the client and its security consultant with reference to the project-specific threat and risk assessment. BS EN 50600-2-5 provides relevant facility-level guidance for data centre security, while product standards such as LPS 1175 may be specified where resistance to forced entry is required. An Uptime Institute Tier classification relates principally to the resilience and availability of the data centre infrastructure; it should not be treated as a security rating for the façade or louvre system.

How are airflow and security requirements reconciled?

Security components placed within or behind an airflow path can reduce the effective opening and increase pressure loss. The impact depends on the selected blade arrangement, support construction and the geometry of any mesh, bars or secondary grille. It cannot be established reliably from the louvre face area alone.

The mechanical and security requirements should therefore be developed together. In some cases, a larger façade opening may be needed to accommodate the design airflow at an acceptable pressure drop. In others, separating the weather louvre from the protected security line may provide a better result. The final arrangement should be coordinated and assessed as a complete assembly.

Can a data centre louvre be assessed for blast resistance?

Yes. Where blast loading forms part of the project brief, the louvre construction can be considered through a project-specific engineering assessment based on its location on the building and the applicable blast pressures. This does not mean that every louvre requires a generic blast rating. The assessment must reflect the proposed system, its supports and its position within the façade.

For louvres assembled from clipped or individually retained components, an important consideration is whether blades or other parts could become dislodged and create a secondary hazard. Additional tethering or a mechanically assembled construction, such as that used within Solinear’s GUARDIAN security louvre system, can help satisfy this requirement. Any proposed arrangement remains subject to review and approval by the project’s blast consultant.

How does Solinear approach data centre façades?

Solinear assesses each data centre façade against its mechanical, environmental, structural, architectural and security requirements. Depending on the brief, the solution may use an AQUARIUS weather or ventilation louvre with separate access protection, a SOUNDEX acoustic louvre where plant noise must be controlled, or a purpose-designed security louvre and door arrangement.

Where a defined level of resistance to forced entry is required, Solinear has developed GUARDIAN, a range of security louvres and louvred doors. GUARDIAN is currently undergoing testing and certification to LPS 1175 SR3 through BRE/LPCB, with certification anticipated in late 2026 or early 2027.

Early involvement allows Solinear to review the airflow criteria, security line, structural interfaces, module sizes, access requirements and architectural treatment before these become fixed. It also allows potential conflicts between weather performance, pressure drop and security construction to be identified while the façade can still be developed efficiently.

Project example: NTT Data Centre, Dagenham

For Phase 2 of NTT’s Dagenham data centre, Solinear delivered an extensive horizontal louvre screen using the AQUARIUS XLINE 100 single-bank extruded aluminium system. The new screen needed to provide the required ventilation and plant-screening function while maintaining continuity with the appearance of the Phase 1 façade, which had been delivered by another specialist contractor.

Solinear developed an alternative construction that reproduced the established external arrangement without simply replicating the earlier system. The result demonstrates how a proprietary louvre can be adapted to a project-specific façade language while retaining a controlled and repeatable method of manufacture.

The XLINE 100 single-bank system suits applications like this, where high air volumes need to pass through the louvre at a low pressure drop and the louvre also acts as plant screening.

AQUARIUS XLINE 100 louvre screening at NTT Data Centre, Dagenham
AQUARIUS XLINE 100 louvre screening at NTT Data Centre, Dagenham.
Horizontal AQUARIUS XLINE 100 louvre screen on NTT Dagenham data centre Phase 2
AQUARIUS XLINE 100 louvre screening at NTT Data Centre, Dagenham.
Detail of extruded aluminium AQUARIUS XLINE 100 louvres at NTT Dagenham
AQUARIUS XLINE 100 louvre screening at NTT Data Centre, Dagenham.

Read the full NTT Data Centre case study.

The key to a successful data centre façade

A successful data centre façade does not maximise airflow or security in isolation. It establishes the required performance for each part of the envelope and coordinates those requirements into a buildable system. That means using verified product data, defining the protected line clearly and allowing the specialist façade design to develop alongside the mechanical and security strategies.

Working on a data centre scheme? Send us your elevations, airflow and pressure drop criteria and security brief, and we’ll review them with you before the façade design is fixed. Contact the Solinear team.

Tom Dwyer MD Solinear - architectural louvres

Tom Dwyer

Position: Managing Director

Tom was raised with the family business and has 20 years’ experience in the sector, working in every facet of the business including fabrication, installation, design, project management, to now fulfilling his role as Managing Director of Solinear. Outside of work, Tom prioritises time with his family, enjoying gardening, keeping fit and travelling as much as possible. He’s still a die-hard Ravens fan!

Make an enquiry

We're on hand if you need any further information, advice or an estimation.

Contact Us

Enquiry form

This field is for validation purposes and should be left unchanged.
Name(Required)
Please let us know what's on your mind. Have a question for us? Ask away.

Specification Support

Utilise our experience in specifying your project to ensure you meet your requirements

Keep up-to-date

Register to receive our newsletter with the latest industry insights and developments

Newsletter signup

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Privacy*